H-Cargo handle a big project to set up a textile factory in Vietnam
H-Cargo Vietnam has successfully handled a big project to set up a textile factory in Vietnam. A total of 13 shipments with different volumes were shipped by sea (LCL and FCL) and air.
To reduce the cost for their client, H-Cargo suggested holding all cargo when it arrived and then to deliver it in one go to the factory. Next the technical team cooperated with their experts to unload and fix the position inside the factory.
- Volume: Total 28 x 40’HQ + 1 x 20’ + 09 x 40’FR + 03 x 20. AFR
- Commodity: Dyecoo Machinery, Textile Machinery, and Toolbox
- Origin: Italia, Germany, Taiwan, Hongkong, South Korea, Netherlands
- Destination: Ho Chi Minh City, Vietnam
- The scope of work: Freight, import customs, transportation, unloading and moving to the position.
Operation procedure:
- Using a crane, forklifts, jacks, roller skates, a spreader to unload and move cargo to the position.
- For the processed vessels (boilers), they used two cranes (one big and one smaller) to ensure unloading without any damages. The others should be loaded by two forklifts.
- Moving the cargo was executed by a forklift, roller skates, and jacks.
- After finishing, they rechecked the position and cleaned up the job site.